Skip to main content
Menu

The Project

This is a historic cycle path which was originally opened in 1938 and ran for a four mile stretch alongside the Formby By-Pass. At the time of its official opening on the 17th December 1938 the bypass itself was considered to be such a technological innovation, because in parts due to the adjacent cycleway, that Lancashire County Council (prior to Sefton Council) produced a 16-page commemorative brochure for the opening which included a map which showed the location of the dais from which the Earl of Derby, Lord Lieutenant of Lancashire made a ribbon-cutting speech to a large group of people.

What we did

Part of a £14 million pound investment by Active Travel, the Formby Cycleway upgrade has seen the conversion of 2245m section adjacent to Woodvale from a cycleway to a cycle-path / footpath by reducing the width from 2.5m to 2m for the cycleway, creating a specific footpath alongside.

TD Construction Testing Ltd worked alongside the client, delivering site and laboratory testing to provide confidence in material performance and compliance throughout the project. Our consistent commitment to reliable and tailored testing creates trust, this project is one of many from a repeat client.

Conducted testing to the highest standards

Delivered value for the client

Ensured quality in construction

Contact us

Get in touch today to speak to one of our highly-experienced team members

Contact us