The Project
This project involved the construction of the first inland surfing lagoon in Europe, using technology to drive up to 2m-high waves. The site is on the former Dolgarrog Aluminium Works, an 18.5ha-contaminated site located in a beautiful and environmentally sensitive area, surrounded by Sites of Special Scientific Interest adjacent to the tidal River Conwy.
What we did
A family-friendly facility, Surf Snowdonia includes a leisure pool, an indoor play centre, a central hub building with waterside restaurant, changing rooms, reception and retail area, a 100-pitch camp site, and landscaped car parks, external play areas, hard and soft landscaping.
Working to tight programme requirements, TD Construction Testing Ltd delivered responsive site and laboratory testing, supporting the client in maintaining progress without compromising quality. It was essential to operate at the highest level in terms of health, safety and the environment due to the sensitive nature of the site.

Conducted testing to the highest standards

Delivered value for the client








